Contract Summary: The Belcarra and Lahardane WwTP’s were required to meet National and European environmental legislation with TES selected as the design and built contractor following […]
Contract Summary: TES were nominated MEICA design and build contractors for the third phase of Fingal County Council’s Balbriggan/Skerries Wastewater Treatment Scheme which consists of upgrade […]
Contract Summary: Barrow (Headin Haw) WwTW is located near the main docks area to the south of Barrow-in-Furness in Cumbria and serves a population equivalent estimated […]
Contract Summary: To ensure security of supply to the network the following Works areas were upgraded at Martholme WTW: the Accrington DMZ pump system, the site […]
Date: 2012 – Ongoing Value: £600,000 Contract Summary: As part of its Biosolids Programme Anglian Water has undertaken a programme of Works aptly named ‘Special Projects’ […]
Date: 2010-2013 Value: £800k/Yr Contract Summary: TES were contracted by Northern Ireland Water’s Mechanical and Electrical (M&E) department to provide services throughout N. Ireland. TES are […]
Date 2010-2013 Contract Value: £400k/yr Contract Summary: TES were contracted by Northern Ireland Water’s Mechanical and Electrical (M&E) department to provide services for 3 NIW geographical […]
Date: 2010—2011 Contract Value: £95,000 Contract Summary: As part of Northern Ireland Water’s ongoing £28m investment commitment to Londonderry’s wastewater infrastructure, a new £4m sewage and […]
Date: 2011— 2012 Contract Value: £300,000 Contract Summary: The project comprised the upgrading of Rakeshole South WTW with new UV and sodium hypochlorite disinfection systems and […]
Date: Jan —March 2011 Contract Value: £500,000 Contract Summary: TES were responsible for design, manufacture and supply of switchgear, MCC and control panels for a new […]
Date: 2009-10 Contract Value: €140,000 Contract Summary: Mullingar WwTP, Co. Meath was designed so that it can operated with the minimum of operator input. TES were […]
Date: 2008—2010 Contract Value: £166,000 Contract Summary: Supply, install and commission MCC for Hamiltonsbawn WwTW, Co. Armagh, N. Ireland to include PLC Software. Supply and install […]
Date: 2008 — 2009 Contract Value: £330,000 Contract Summary: Thamesmead Lake 4 Pumping Station is located on the South Bank of the River Thames in South […]
Date: 2010-2012 Contract Value: £900,000 Contract Summary: A Joint Venture (JV): Graham/Aecom/TES awarded contract which included detailed design and construction of 28km of trunk watermain, a […]
Date: 2011— 2012 Contract Value: £1.95m Contract Summary: In an average year approximately 30% of water supplied in Essex is sourced from outside the area by […]
Date: June—October 2011 Contract Value: £250,000 Contract Summary TES were nominated Contractor responsible for complete MEICA design, manufacture, installation, testing and commissioning of the new King‘s […]
Date: June-Nov 2010 Contract Value: €450,000 Contract Summary: TES were responsible for the supply, installation and commissioning of mechanical and electrical equipment, instrumentation, control, telemetry and […]
Date: 2009—2010 Contract Value: €400,000 Contract Summary: TES were responsible for the complete design, supply and installation of all M&E Works related to the construction of […]
Date: 2008—2010 Contract Value: €3.5m Contract Summary The scheme involved the construction of a WTW with capacity to produce 3,635m3 /day of potable water with provision […]
Date: 2008—2009 Contract Value: £1.37m Contract Summary: TES were the nominated MEICA contractor for the replacement and upgrade of existing MCC plant and associated systems on […]
Date: March—June 2009 Contract Value: £320,000 Contract Summary Morcott WTW is a £50m water treatment works constructed for for Anglian Water as part of the £117m […]
Date: 2009 Contract Value: €643,000 Construction of 1 No. 715m3 storm attenuation tank Construction of 1 No. storm inlet overflow chamber—Provision of fine screen in the […]